Public review period for B52 draft runs from Jto August 14, 2018.Public review period for B51 draft runs from Jto August 19, 2018.The public review periods for B51 and B52 drafts are as follows: (NOTE: Free registration with CSA is required to view or comment on the draft). The drafts for the next editions of B51and B52 are now available in CSA Group’s public review website at for review and comment. This is a final reminder that public review on the drafts for the next edition of CSA’s B51 (boiler, pressure vessel, and pressure vessel piping code) and B52 (mechanical refrigeration code) standards is underway, and the public review period will soon end.ĬSA’s B51 standard covers general requirements for boilers, pressure vessels and pressure piping, and CSA’s B52 standard provides minimum requirements for the design, construction, installation, inspection, and maintenance of the mechanical refrigeration systems. Reminder - Public Review on Next Edition CSA B51 and B52 Standards
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |